Client

MENARD GEOSYSTEM

Location

CIKANDE, BANTEN

Year

TBA

Project Value

IDR 12.654.000.000

This project involves bored pile foundation works and earthworks for the construction of the Pollymare Factory located in Cikande, Banten. The client for this project is SNF.

The scope includes detailed site preparation, soil excavation, and installation of bored piles to provide a strong and stable foundation for the factory structures. The earthwork activities cover grading, leveling, and soil compaction to prepare the site for subsequent construction phases.

All works are conducted following applicable engineering standards and safety regulations to ensure structural integrity and timely project delivery. This foundational work is essential to support the factory’s operational efficiency and long-term durability.

Related Project

Earthwork
This project involves bored pile foundation works and earthworks for the construction of the Pollymare Factory located in Cikande, Banten. The client for this project is SNF. The scope includes detailed site preparation, soil excavation, and installation of bored piles to provide a strong and stable foundation for the factory structures. The earthwork activities cover grading, leveling, and soil compaction to prepare the site for subsequent construction phases. All works are conducted following applicable engineering standards and safety regulations to ensure structural integrity and timely project delivery. This foundational work is essential to support the factory’s operational efficiency and long-term durability.