Client
MENARD GEOSYSTEM
Location
CIKANDE, BANTEN
Year
TBA
Project Value
IDR 12.654.000.000
This project involves bored pile foundation works and earthworks for the construction of the Pollymare Factory located in Cikande, Banten. The client for this project is SNF.
The scope includes detailed site preparation, soil excavation, and installation of bored piles to provide a strong and stable foundation for the factory structures. The earthwork activities cover grading, leveling, and soil compaction to prepare the site for subsequent construction phases.
All works are conducted following applicable engineering standards and safety regulations to ensure structural integrity and timely project delivery. This foundational work is essential to support the factory’s operational efficiency and long-term durability.
Related Project
Earthwork
This project involves bored pile foundation works and earthworks for the construction of the Pollymare Factory located in Cikande, Banten. The client for this project is SNF.
The scope includes detailed site preparation, soil excavation, and installation of bored piles to provide a strong and stable foundation for the factory structures. The earthwork activities cover grading, leveling, and soil compaction to prepare the site for subsequent construction phases.
All works are conducted following applicable engineering standards and safety regulations to ensure structural integrity and timely project delivery. This foundational work is essential to support the factory’s operational efficiency and long-term durability.